Hello everyone. B Term is coming to a close, and we have one last update before the new year. This week the ME decided to switch the pressure vessel from a cylindrical shape to a rectangular prism. They also will be working on calculating flow and drag. The ECE team finished the power schematic and received all parts for the AHD board revision. The prototype will be assembled within the week. Meanwhile the CS team has been able to connect to the FitPC to a DyIO. Currently they are working on creating a GUI for the poolside interface. At the individual team advisor meetings, each team will present a show and tell of everything they have accomplished. We hope everyone has a terrific holiday break, and we will see you all in 2013 and C Term.